The Dalek has finally been finished and gifted. And just a couple days late. Just in time to take in another request from a friend. But I have some lovely Royal Blue Karabella Aurora 8 so I think this will be my first Worsted Dalek. It came out really well approx 5″ high. And the appendages are much stiffer than they were on the first two.

So while watching Ice Dancing I cast on for the shrug I designed and reading over the pattern I wrote? I seem to have made it to the end of the sleeve and had not decided what would be done next. Knit across then pick up stitches and knit down or increase until the back is reasonable. I ‘m leaning towards the second as I’m knitting flat anyway and it would be fairly simple to increase across. It will be interesting to see how to work the lace pattern into the increases.
I settled on some Malabrigo sock in Eggplant. It looks mostly gray to me but I have two skeins of it to bring my total to 880 yards. I’ve ended up with about a 3 hour commute tomorrow, so it should give me time to make enough progress to make some decisions about how feasible this shrug is or if i will have to just pick up someone else’s pattern.
I’ve also picked up a lace scarf pattern for this journey, in case things go horribly wrong with the shrug i will have something else to work on. Also its a good way to finish off what seems like most of the skein of the purple used in the dalek. Granted I will also have a novel, my laptop for writer’s group that evening, and possibly my DS. But I do have a bit of boredom fear. It leads me to have lots of large bags, and more things than I could get done stranded for days.
Though I also need to work on the Flash pattern. Apparently there isn’t one in the Justice League Scarf. I Know I used the Green Lantern outline as a base, but there seem to be no notes on the lightening bolt. And everything I’ve charted so far looks odd. Even when I tried to copy the pattern from the actual scarf. I think I have a solution to it. But it needs to be charted and knit.
The paid time for the pattern is nearing an end 13 people have ordered the pattern so far. And I think I shall be doubling the donation to Habitat for Humanity for Haiti come 3/1. Its more than I would have been able to do on my own. So I thank everyone who donated.
I was lucky enough to not have lost anyone, but their homes were a different story, and while basic needs are still having trouble being met, I hope that soon, food, water, and medical care, will no longer be the driving force, and instead it will be rebuilding.
Knitting
dalek, donations, flash, haiti, justice league, pattern, ravelympics, shrug